road-surfacingtarmacbrook-placefrittenden
Site Preparation: The prepared roadway areas were thoroughly cleaned and checked for level and stability to ensure a solid foundation for surfacing.
Surfacing: Over the prepared base, we laid AC10 open-tex permeable tarmac.
This specification allows water to drain effectively, helping meet local planning regulations and supporting sustainable drainage (SuDS) requirements.
Location: Frittenden
Client: Canham Homes