Get a free quote β
AC10 open-tex permeable tarmac β Frittenden
Road Surfacing
Location
Frittenden
Client
Canham Homes
Surface
AC10 open-tex permeable tarmac
Scope
New development roads
βTo ensure full compliance with planning regulations, we installed AC10 open-tex permeable tarmac throughout the development.β
Project details
What we did
- Project brief: Ashford Tarmac was commissioned by Canham Homes to complete road surfacing works at the newly developed Brook Place in Frittenden. The aim was to provide a durable, compliant surface suitable for all vehicular use while meeting planning requirements.
Site Preparation: The prepared roadway areas were thoroughly cleaned and checked for level and stability to ensure a solid foundation for surfacing.
Surfacing: Over the prepared base, we laid AC10 open-tex permeable tarmac.
This specification allows water to drain effectively, helping meet local planning regulations and supporting sustainable drainage (SuDS) requirements.
- Why We Chose AC10 Open-Tex? AC10 open-tex permeable tarmac is ideal for residential developments. Its benefits include: excellent water drainage, compliance with SuDS and planning regulations, strong performance under vehicular traffic, and a clean, modern appearance that complements new-build environments.
- Result & Benefits: The completed road surfacing provides a durable, permeable, and regulation-compliant surface for Brook Place. Improved drainage ensures safer access for residents and visitors. The smooth, professional finish enhances the aesthetic of the newly constructed homes, offering a long-lasting, practical solution.
Got a similar project?Get a free quote.
Enquiry sent. We'll be in touch shortly.




