Understanding the Tarmac Installation Process
- At Ashford Tarmac, we know that installing a new tarmac surface can feel daunting. Whether it’s a driveway, car park, or residential road, knowing the steps, timescales, and preparations can make the process stress-free and build confidence in the work being carried out.
Domestic surfacing, Commercial surfacing or Public Sector surfacing are completed with a structured installation process to ensure durability, compliance, and a professional finish, we’ve perfected this methodology over 40 years.
Site Survey & Quote
Every project starts with a thorough site survey. Our surveyors will:
- Assess the existing surface and sub-base
- Identify drainage and planning considerations
- Take accurate measurements to calculate materials and costs
After the survey, we provide a detailed, no-obligation quote, so you know exactly what to expect in terms of scope, cost, and requirements.
Sub-Base Requirements & Drainage
A strong sub-base is the foundation of a long-lasting tarmac surface. Key steps include:
- Removal of unsuitable soil, debris, or old material
- Compaction to create a stable, level platform
- Installation of drainage channels to prevent water pooling
A properly prepared sub-base prevents long-term issues and ensures your tarmac surface performs as intended.
Tarmac Thickness & Materials
Choosing the correct thickness and material depends on the usage:
- Residential driveways: 40–50 mm
- Car parks and light commercial areas: 60–80 mm
- High-traffic or industrial surfaces: bespoke specifications
Common materials we use include Stone Mastic Asphalt (SMA) and AC10 open-tex permeable tarmac, selected for durability, water drainage, and visual finish.
Equipment & Machinery Used
Professional installation requires the right equipment:
- Mechanical rollers for compacting the base and surface
- Pavers for laying asphalt evenly
- Hand tools for edges and smaller areas
Combining modern machinery with skilled workmanship ensures a long-lasting, professional finish.
Timescales & What to Expect on Install Day
Understanding timelines helps reduce disruption:
- Small residential driveways: 1–2 days
- Commercial car parks: 2–5 days
- Larger roads: scheduled over several weeks
On installation day, the team will:
- Prepare the site and mark out areas
- Lay and compact the sub-base (if required)
- Install the tarmac surface
- Complete finishing touches, edging, and clean-up
Aftercare advice, including curing times and maintenance tips, will be provided on completion.